ZHENG, Junli, ZHAO, Junbo und ZHAO, Sixiang, 2025. A heuristic method for multi-objective hybrid flow shop scheduling problem with parent-child relationships and space constraints. International Journal of Production Research. 1 April 2025. Vol. 63, no. 7, p. 2431-2455. DOI 10.1080/00207543.2024.2403126.
Elsevier - Harvard (with titles)Zheng, J., Zhao, J., Zhao, S., 2025. A heuristic method for multi-objective hybrid flow shop scheduling problem with parent-child relationships and space constraints. International Journal of Production Research 63, 2431-2455. https://doi.org/10.1080/00207543.2024.2403126
American Psychological Association 7th editionZheng, J., Zhao, J., & Zhao, S. (2025). A heuristic method for multi-objective hybrid flow shop scheduling problem with parent-child relationships and space constraints. International Journal of Production Research, 63(7), 2431-2455. https://doi.org/10.1080/00207543.2024.2403126
Springer - Basic (author-date)Zheng J, Zhao J, Zhao S (2025) A heuristic method for multi-objective hybrid flow shop scheduling problem with parent-child relationships and space constraints.. International Journal of Production Research 63:2431-2455. https://doi.org/10.1080/00207543.2024.2403126
Juristische Zitierweise (Stüber) (Deutsch)Zheng, Junli/ Zhao, Junbo/ Zhao, Sixiang, A heuristic method for multi-objective hybrid flow shop scheduling problem with parent-child relationships and space constraints., International Journal of Production Research 2025, 2431-2455.